Results 1 to 1 of 1
  1. Username Protected
    Frequent Poster

    Posts
    93 Posts
    Thanked 33 times
    Other Services Provider
    Join Date
    Joined Jun 2022
       #1  

    Guayaquil, Ecuador (SEGU) TMA Procedures

    The Ecuador Civil Aviation Authority is implementing a new RADAR and ADS-B system for the Guayaquil TMA (SEGU). In anticipation of this, an AIC (AIC 06/23) was published in the Ecuador AIP with very detailed and specific procedures to be followed covering a wide range of issues which will undoubtedly reduce airspace capacity and increase lead times.

    A NOTAM has since been published announcing the start of the RADAR transition and the implementation of the procedures in the AIC. Pilots will be well advised to download the attached AIC and study it carefully if they plan to fly to/from SEGU. There is a tremendous amount of detail in there beyond what we have seen with other similar implementations.
    Attachments Attachments

Posting Permissions