Results 1 to 1 of 1
-
Username ProtectedFrequent Poster
- Posts
- 93 Posts
- Thanked 33 times
- Other Services Provider
- Join Date
- Joined Jun 2022
09-21-2023, 08:33 PM#1
Guayaquil, Ecuador (SEGU) TMA Procedures
The Ecuador Civil Aviation Authority is implementing a new RADAR and ADS-B system for the Guayaquil TMA (SEGU). In anticipation of this, an AIC (AIC 06/23) was published in the Ecuador AIP with very detailed and specific procedures to be followed covering a wide range of issues which will undoubtedly reduce airspace capacity and increase lead times.
A NOTAM has since been published announcing the start of the RADAR transition and the implementation of the procedures in the AIC. Pilots will be well advised to download the attached AIC and study it carefully if they plan to fly to/from SEGU. There is a tremendous amount of detail in there beyond what we have seen with other similar implementations.
- Quick Links
- New Posts
- Participated
- Subscribed
- Today's Posts
- Hot This Week