Results 1 to 3 of 3
  1. Username Protected
    Really Frequent Poster

    Posts
    199 Posts
    Thanked 103 times
    Phenom 300 Owner & Pilot
    Join Date
    Joined Nov 2020
       #1  

    Post 10 Year Maintenance Acceptance Test Plan

    I hopefully am picking up my Phenom 300 from Duncan later this week. It has been down for the 10Y for nearly 4 months due to Embraer landing gear parts issues. That is a very long and troubling story for another thread.

    Does someone have a post "C-Check" test plan they can share; even a generic one? I am looking for a checklist of items to test on the ground and in air such as pressurization, bleeds, fuel flows, etc.

    Thanks!
  2. Username Protected
    Member

    Posts
    59 Posts
    Thanked 29 times
    Other Services Provider
    Join Date
    Joined Oct 2020
    #2  
    Hi Phil,

    As they approach the end of the 10Y there are quite a few Operational Checks. I'll send you an email. If you chose we can put something together.
  3. Username Protected
    Really Frequent Poster

    Posts
    199 Posts
    Thanked 103 times
    Phenom 300 Owner & Pilot
    Join Date
    Joined Nov 2020
       #3  
    I was provided an Embraer Acceptance Test Flight plan which is pretty comprehensive. I'm editing the document to include additional items such as interior/exterior inspections, more thorough pressurization checks (e.g. Dump) and equipment list.

    If someone has a comprehensive check list for things like current rev of AFM/QRH/POH/MEL, gear pins, covers, etc I'd appreciate it.

Posting Permissions